About Custom Hard Case

Our story

An EVA press shop that grew into a case factory

Custom Hard Case started in 2015 as an EVA press shop in Shijie Town, Dongguan, pressing shells for other case traders. No tool room, no stitching, no logo work: someone else's drawing came in, a pressed shell went out. That work showed us exactly where a case order fails — a mould nobody kept, a foam cavity cut by eye, a zipper fitted after the shell was already closed.

So we built the missing steps ourselves. The foam-cutting room came first, then six stitching lines, then in-house logo application: heat transfer, embossing and metal plates under the same roof as the presses. Today 120+ people press around 150,000 pcs a month for buyers in 35+ countries, and we hold 300+ moulds on file. More than half of the orders we ship are reorders, because the mould stays on file with its cavity dimensions, wall thickness and fabric record.

Talk to our team
Stitching line inside the Custom Hard Case factory in Shijie, Dongguan
10+ Years in Shijie, Dongguan
120+ Staff on one floor
150,000 pcs Cases pressed per month
35+ countries Export markets
How we work

Four principles we do not trade

Mould discipline

Every shell is measured against its tool at ±1.5 mm on wall thickness and corner radius. If a press drifts, we stop the run and re-shim the tool instead of shipping the variance.

Insert before shell

The insert is designed first, from the device outline at ±2 mm. The shell is then drawn around the insert, so the cavity fits the product rather than the product being squeezed into the cavity.

Honest quoting

Tooling is quoted as its own line before you commit: US$600–1,400 for a new mould, credited against 2,000 pcs. If a stock mould fits, we say so and charge nothing for tooling.

Repeatable quality

AQL 2.5 final inspection, inline checks at every press and a 1.2 m drop test on six faces. The same gates run on a 300-piece order and a 30,000-piece one.

Die-cut EVA foam inserts laid out on a cutting table
The floor

Six areas, one 4,200 m² floor

A case moves through six areas: tool room, moulding, foam cutting, stitching, logo and finishing, and packing. All six sit in one building in Shijie Town, so a cavity that reads 2 mm out is corrected at the tool room the same afternoon instead of across a city. Tool room, moulding, cutting, stitching and finishing carry fixed headcounts and total 120 people; packing is staffed from that same finishing team.

Tool room
8 toolmakers on masters, cavities and repairs; 300+ moulds kept on file.
Moulding
26 press operators on 6 compression presses running at 160–180 °C.
Foam cutting
18 operators on 4 die-cutting presses, up to 1,200 × 800 mm.
Stitching
52 machinists across 6 stitching lines: zippers, webbing handles, D-rings.
Logo & finishing
16 staff on heat transfer, embossing, metal plates and final trimming.
Packing
Staffed from the same 16 in finishing, so nothing is counted twice.
Where we ship

Hard cases for 35+ countries

North America, the EU and UK, Australia, Japan, Korea and the Gulf. We quote FOB Shenzhen or Yantian, CIF and DDP, and work with your forwarder when you have one.

Palletised cartons of finished EVA cases in the warehouse

Export documentation

Commercial invoice, packing list and certificate of origin with every shipment; REACH and RoHS test reports available on request.

Cases being packed into printed retail cartons

Retail-ready packing

Polybag, printed sleeve, window box or rigid gift box, with barcode, FNSKU label and carton marks applied before sealing.

Visit us in Dongguan — or start with a sample

We host factory visits in Shijie Town and video walkthroughs for buyers who cannot fly. Either way, one sample tells you more than a brochure.