Custom Case Moulds and Tooling, From Drawing to Sample

A mould is what makes a case fit one device. We draw the shell in 3D from your sample or files, cut a CNC master in tooling board or aluminium, and press the first shell in a compression mould. Tooling runs 15–20 days and US$600–1,400, credited at 2,000 pcs. Before any of that we check the 300+ moulds already on file.

Tooling

From a device sample to a CNC master

We start from the device itself or a 3D file: external dimensions, corner radii, port and button positions, and 1.5 mm clearance on every side. A 3D drawing comes back within 3 days with the parting line, the 5 mm wall thickness and the insert cavity marked. You approve the drawing before any steel is cut. If you have no file, we measure your sample with calipers to 0.1 mm and send the drawing for confirmation.

The master is cut on a CNC router from laminated wooden tooling board or from aluminium. The wooden pattern suits a 300–500 pcs run and costs less; aluminium holds a sharper edge for 2,000+ pcs and a 0.6 mm emboss. The master is then pressed into a steel female mould, and the first shells come off that press, not from a hand-laminated mock-up. A new master takes 5–7 days of machining; a revision after a fit check adds 3 days, which is why the drawing sign-off matters.

  • Device mock-up: 1.5 mm clearance on all six sides
  • 3D drawing back in 3 days with parting line and wall thickness
  • CNC wooden master (300–500 pcs) or aluminium master (2,000+ pcs)
  • Tooling 15–20 days, US$600–1,400, credited at 2,000 pcs
Send a device file
Aluminium case mould on the compression moulding press
Geometry

Three parts of a mould drawing that decide fit

A drawing that ignores any one of these comes back as a case the device does not sit in properly.

Shell geometry

Length, width, depth and corner radii come from the 3D drawing, with 1.5 mm clearance on every side and the parting line placed on the least visible face.

Insert cavity

The cavity is cut 1 mm larger than the device outline and 12 mm deep for 38D foam, so a screen never rests on the zipper tape in transit.

Parting line and finish

The parting line runs along the base, where a 0.3 mm step hides under the zipper tape. Face fabric is laminated before pressing, never after.

First-off sample

The first-off sample, measured to ±1.5 mm

The first-off sample is a finished case, not a bare shell: zipper sewn around the 3D curve, insert die-cut to the device, logo applied, lid closed and latched. We measure overall length, width, depth and the insert cavity against the drawing at ±1.5 mm, and photograph all six faces before the case is couriered to you. The first bulk carton is measured against the same sheet, so a gap between sample and bulk shows up early.

You get the sample, a measurement sheet, the mould number and a photo report. Approve it and bulk runs 20–30 days; reject a dimension and the master is recut before a single shell is pressed. The mould stays in our library under your number, so a reorder skips tooling entirely. That is also why we ask you to check the library first: 300+ shapes are already drawn, and a match saves the whole US$600–1,400.

  • First-off sample measured at ±1.5 mm on length, width and depth
  • Insert cavity held to ±1 mm, zipper path to ±2 mm
  • Measurement sheet and photo report with every sample
  • Mould number kept on file for reorders
Approve a first-off sample
First-off EVA case measured against the drawing at the bench
Tooling

Moulds and samples from the tool room

Masters, cavities and first-offs from recent programmes. Device details are withheld where the customer asked for it.

Process

Five steps from device to first-off sample

Tooling is the slowest part of a case programme, and the only part you cannot rush with more labor.

01

Send the device or a 3D file

A STEP file, a physical sample or a dimensioned drawing. With a sample in hand we measure to 0.1 mm and confirm the numbers with you.

02

Check the mould library

300+ moulds are on file. If one is within 1.5 mm of your device we adjust the insert instead, and the US$600–1,400 tooling disappears. That check takes two working days.

03

Approve the 3D drawing

The drawing shows the parting line, wall thickness, cavity and logo position. Changes are free before the CNC master is cut, and cost a recut after.

04

Tooling and first-off sample

CNC master, steel mould and first shell in 15–20 days, then a pilot carton measured against the same sheet, so drift shows up before the run is finished.

05

Bulk and delivery

20–30 days after sample approval at 150,000 pcs a month capacity, shipped FOB Shenzhen or Yantian, CIF or DDP, on 30% deposit and 70% before shipment.

Specs

Mould and tooling specification

Tooling
New compression mould, US$600–1,400 one-off, credited against 2,000+ pcs
Tooling lead time
15–20 days from drawing approval to first-off sample
Master
CNC wooden tooling board for 300–500 pcs, aluminium for 2,000+ pcs and a 0.6 mm emboss
Tolerance
±1.5 mm on shell length, width and depth; ±1 mm on the insert cavity
Device mock-up
Sample or STEP file, 1.5 mm clearance on every side, corner radii and port positions
Mould library
300+ existing moulds; a match removes the tooling charge
Sampling
7–10 days on an existing mould, 15–20 days with a new mould
MOQ
300 pcs per style (100 pcs per colour on stock moulds)
Bulk production
20–30 days after sample approval, 150,000 pcs per month
Payment
30% deposit, 70% before shipment; FOB Shenzhen / Yantian, CIF or DDP
Budget

Library mould or new tooling

Case prices are FOB Shenzhen at 1,000 pcs. Tooling is a separate one-off line on the invoice and is credited at 2,000 pcs.

Library mould

US$2.50–5.00 / pc

A mould already in the 300+ library, at 100 pcs per colour, with no tooling charge.

  • 100 pcs per colour
  • Sample in 7–10 days
  • Tolerance ±1.5 mm
  • Tooling US$0

New mould, volume

US$6.00–12.00 / pc

Large drone, VR and keyboard cases at 2,000 pcs, with the tooling credited in full.

  • 2,000 pcs for the credit
  • Aluminium master
  • 38D insert and velvet lining
  • Bulk in 20–30 days

Mould and tooling questions

Do I need a new mould for my case?
Not always. We hold 300+ moulds. If one is within 1.5 mm of your device we adjust the insert and skip the US$600–1,400 tooling charge. Send the dimensions and we check before quoting.
What does tooling cost, and is it credited?
US$600–1,400 one-off. It is credited in full against orders of 2,000 pcs or more, so a programme that scales pays no tooling in the end.
How long does a new mould take?
15–20 days from drawing approval to the first-off sample, including the CNC master and the steel mould. Sampling on an existing mould is 7–10 days, and bulk follows in 20–30 days.
What do you need to draw the case?
A STEP or IGES file, or the device itself. We measure the sample to 0.1 mm, add 1.5 mm clearance on every side and mark ports, buttons and the lid hinge on the drawing.
What tolerance can the mould hold?
±1.5 mm on shell length, width and depth, ±1 mm on the insert cavity and ±2 mm along the zipper path. Anything outside that is recut before bulk.

Check the library before you pay for tooling